About
MARTA

Performance (May 2018):

In May, did not meet the Target; the actual being 3.88 – a decrease of 1.55 compared to that in the previous month.

Corrective Actions:

  1. Evaluate operators assigned to the top three routes with the highest number of preventable collisions 
  2. Improve operator training
  3. Identify locations with the most frequent collisions and keep operators aware