Projects

Indian Creek Station Rehabilitation

Current Status: Construction (see below for important ADA access information)

indiancreek1

Image description: The image above shows a design rendering of ongoing renovations to the exterior entrance for Indian Creek MARTA station. A concrete plaza is in the foreground, with multiple people walking and sitting outside. A new public artwork stands in the center.  

Overview:  

MARTA is renovating Indian Creek Station as part of its State of Good Repair program. The most exciting new feature will be a pedestrian bridge that crosses over the tracks and connects to Durham Park Road on the north side of the station. There will also be extensive upgrades to the platform, concourse, walls, furniture, elevator, lighting, public artwork, landscaping, and deep cleaning. The timeline for completion of the pedestrian bridge is April 2025. 

RIDER ALERT:

Due to these renovations, the elevator will be inaccessible from April 11 to June 9, 2024. For elevator access, please exit at Kensington Station and take the Mobility Shuttle to Indian Creek Station. The Mobility Shuttle will run every 10 to 15 minutes and be available during all MARTA service hours. In addition, three bus routes will be temporarily moved from the bus bay to the nearby Kiss & Ride lane:

  • Ride Gwinnett #70
  • MARTA #111
  • MARTA #116

Project Features 

  • A new Pedestrian Bridge for access from Durham Park Road  
  • New lighting and illuminated signage at the platform, plaza and concourse levels 
  • New high-pressure laminate (HPL) wall paneling, metal doors, and door frames 
  • New landscaping, trash receptacles, and benches  
  • Pressure cleaning throughout the station  
  • New copper gutter system  
  • Repairing and refinishing the existing wood barrel ceiling  
  • Newly design embedded concrete at the platform, plaza and concourse levels
  • New SMART Restroom for customers, as well as a new operator restroom on the platform level 
  • Repaving the parking lot and bus loop, and adapting the design for better traffic flow  
  • New roof and HPL exterior wall paneling on the Police Precinct and the Traction Power Substation (TPSS) Buildings  
  • Repair of the windscreens at the platform level  
  • New artwork installations 

indiancreek2

Image description: The image above shows a design rendering of the future pedestrian bridge connecting Indian Creek MARTA Station to the community to the north. The bridge extends from the station entrance at the upper right across to the lower left. 

Stay Informed

Sign up for email updates!   

Contact:

Please submit comments regarding the project via mail or email to: 
Romon Moultrie, MARTA Project Manager 
rmoultrie@itsmarta.com 